The opportunity

What the capital does.

A modular build means capital deploys in tranches sized to proven energy, rather than committing to a single large facility before the first megawatt is confirmed.

Use of proceeds

ApplicationWhat it buys
Ughelli site, construction and modulesPhase-one 5.5 MW build
Generation interface and grid worksConnection to group generation
Compute hardwareMiners first, GPU capacity in phase two
Development capitalPermits, FEED, legal, land
Working capitalTwelve months of operations

Amounts are published when the model is signed off.

The comparison that matters

All-in delivered power cost.

Evidence tier: Modelled

$0.042/kWh

Exusia Digital at Ughelli, on associated gas: fuel, O&M and generation capex recovery included.

As at August 2026. Financial model v3
All-in delivered power cost, US dollars per kWh
SourceRangeUS$ per kWhEvidence tier
Exusia Digital, Ughelli 0.042 Evidence tier: Modelled
Nigerian grid, industrial 0.09 to 0.13 Evidence tier: Illustrative
Diesel generation, Lagos 0.28 to 0.35 Evidence tier: Illustrative
US merchant power, ERCOT 0.03 to 0.05 Evidence tier: Illustrative

US dollars per kWh. Comparators are illustrative ranges. We publish the comparison least flattering to us (ERCOT) because an investor will find it anyway.

Capital efficiency

Modular containerised build, per MW $3.3M to 4.4M Evidence tier: Modelled As at August 2026. Financial model v3
Conventional Tier III facility, per MW ~$11.3M Evidence tier: Illustrative

Excludes generation, which is held at group level.