The raise, the risks, and the room.

We are a development-stage company and we do not pretend otherwise. What we offer instead of assets we have not built is complete visibility of where each project actually stands, what every number is based on, and what could go wrong.

The raise

Use of proceeds3 sitesEvidence tier: ModelledAs at August 2026. Financial model v3Ughelli first, then Lagos, then the research cluster.

Why this is investable

  1. We hold the scarce input

    Everyone else in this market is buying power. The group generates it. That is not a marketing position, it is a balance-sheet one.

  2. Revenue does not wait for AI demand

    Digital-asset mining monetises the power from energisation. The AI thesis is the upside, not the base case.

  3. Modular capex, not a mega-project

    Containerised build at a fraction of the roughly $11.3M per MW a conventional Tier III facility costs. Capital deploys in tranches sized to proven energy.

  4. The energy has no other buyer

    Flared gas earns its producer nothing and carries regulatory risk. That is the basis for a supply price no grid-connected competitor can match.

  5. We publish what we do not know

    Evidence tiers, a public risk register and published model assumptions. Diligence starts further along with us than it does elsewhere.

Portfolio

Where each project stands

Delta State, associated gas

Ughelli Modular Site

Evidence tier: In development
Capacity5.5 MW
Power cost$0.042 /kWh
Capex band$18M to 24M
EnergisationQ3 2028

4 of 9 done, next: permits granted in Q3 2027

Lagos, group-owned gas generation

Lagos AI Compute Pilot

Evidence tier: Modelled
Capacity2.0 MW
Power costTo confirm
Capex band$9M to 12M
Energisation2029

1 of 9 done, next: energy source agreed

Location to be confirmed

HPC Research Cluster

Evidence tier: Modelled
CapacityTo confirm
Power costTo confirm
Capex bandTo confirm
Energisation2029

0 of 9 done, next: site identified

Capacity tracker

Every megawatt, labelled by how real it is.

Pipeline is not capacity. We show both, with the stage and the evidence behind each figure.

42 MW identified
0 MW energised today
Energised
0 MW
Evidence tier: ContractedAs at August 2026. Financial model v3
Under construction
0 MW
Evidence tier: PermittedAs at August 2026. Financial model v3
In development
5.5 MW
Evidence tier: In development To be confirmedAs at August 2026. Ughelli phase one
Assessment
36.5 MW
Evidence tier: Modelled To be confirmedAs at August 2026. Financial model v3

To be confirmed The split of the identified pipeline between stages is provisional until management confirms it.

As at August 2026. Updated with each model version. Method and sources on the assumptions page. The method

Documents

Nothing here needs a sales call.

The memo and the capability statement need no NDA. The model and the data room do.

  • PDF
    Investment thesis memo12 pages, updated August 2026. Available on request
  • PDF
    Technical capability statement8 pages, updated August 2026. Available on request
  • XLS
    Financial modelNDA required
    Request
  • NDA
    Data roomNDA required, access within 1 business day
    Request

All figures in these documents carry the same evidence tiers used on this site.

Request a document

Next step

Talk to us directly.

Ask for a briefing here. A data-room request gets a reply within 1 business day.

We reply within 1 business day.

Quarterly updates

One note per quarter on milestone movement.

Nothing else, ever. When a project changes evidence tier, that is the news.

We do not add you to any other list. Unsubscribe from any email.