Deployment layer, energy-first
Modular Sites
Rather than one mega data centre, we build modular facilities sized to the energy source they sit on. Factory-built, containerised, deployable in months rather than years.
What a buyer qualifies us on
Specification
Economics
All-in delivered power cost.
Evidence tier: Modelled
$0.042/kWh
Exusia Digital at Ughelli, on associated gas: fuel, O&M and generation capex recovery included.
As at August 2026. Financial model v3| Source | Range | US$ per kWh | Evidence tier |
|---|---|---|---|
| Exusia Digital, Ughelli | 0.042 | Evidence tier: Modelled | |
| Nigerian grid, industrial | 0.09 to 0.13 | Evidence tier: Illustrative | |
| Diesel generation, Lagos | 0.28 to 0.35 | Evidence tier: Illustrative | |
| US merchant power, ERCOT | 0.03 to 0.05 | Evidence tier: Illustrative |
US dollars per kWh. Comparators are illustrative ranges. We publish the comparison least flattering to us (ERCOT) because an investor will find it anyway.
Next step
Tell us what you need.
A named engineer replies within 2 business days.