Exusia Digital

Deployment layer, energy-first

Modular Sites

Rather than one mega data centre, we build modular facilities sized to the energy source they sit on. Factory-built, containerised, deployable in months rather than years.

What a buyer qualifies us on

Specification

Build type Containerised, factory-built Evidence tier: In development
Siting Co-located with generation Evidence tier: In development
Deploy time Months, not years Evidence tier: Modelled As at August 2026. Financial model v3
Smallest unit Single container Evidence tier: Illustrative
Scaling Sized to available energy Evidence tier: Illustrative

Economics

All-in delivered power cost.

Evidence tier: Modelled

$0.042/kWh

Exusia Digital at Ughelli, on associated gas: fuel, O&M and generation capex recovery included.

As at August 2026. Financial model v3
All-in delivered power cost, US dollars per kWh
SourceRangeUS$ per kWhEvidence tier
Exusia Digital, Ughelli 0.042 Evidence tier: Modelled
Nigerian grid, industrial 0.09 to 0.13 Evidence tier: Illustrative
Diesel generation, Lagos 0.28 to 0.35 Evidence tier: Illustrative
US merchant power, ERCOT 0.03 to 0.05 Evidence tier: Illustrative

US dollars per kWh. Comparators are illustrative ranges. We publish the comparison least flattering to us (ERCOT) because an investor will find it anyway.

Next step

Tell us what you need.

A named engineer replies within 2 business days.