The flexible load
Digital-Asset Infrastructure
Bitcoin mining is the most flexible workload ever built. It ramps the instant power is available and stops the instant it is not, which makes it the only workload that can monetise stranded and curtailed energy from day one.
What a buyer qualifies us on
Specification
Hosting
Build a hosting quote.
Units, power per unit and term. We reply with a quote within 2 business days.
Economics
All-in delivered power cost.
$0.042/kWh
Exusia Digital at Ughelli, on associated gas: fuel, O&M and generation capex recovery included.
As at August 2026. Financial model v3| Source | Range | US$ per kWh | Evidence tier |
|---|---|---|---|
| Exusia Digital, Ughelli | 0.042 | Evidence tier: Modelled | |
| Nigerian grid, industrial | 0.09 to 0.13 | Evidence tier: Illustrative | |
| Diesel generation, Lagos | 0.28 to 0.35 | Evidence tier: Illustrative | |
| US merchant power, ERCOT | 0.03 to 0.05 | Evidence tier: Illustrative |
US dollars per kWh. Comparators are illustrative ranges. We publish the comparison least flattering to us (ERCOT) because an investor will find it anyway.
